THEPROCESSGROUP

DALE WILLIAMSON
Home Page

Services

Principals

Clients

Projects

Contacts

SKILLS:
Over 25 years experience in all aspects of refinery and chemical plant process design and analysis, including utility systems.

EDUCATION:
B.S. Chemical Engineering, University of Southern California, 1976

EMPLOYMENT HISTORY:
1977-1998 Fluor Daniel Inc. in Irvine, CA

EXPERIENCE: 

Process engineering experience:

  • FCC & coker offgas liquids recovery unit for ARCO in Carson, CA (1997-1998)
  • Natural gas liquids recovery unit for Pemex in Tabasco, Mexico (1997)
  • Natural gas liquids recovery unit revamp for Pemex in Chiapas, Mexico (1996-1997)
  • Crude, vacuum, naphtha stabilization and LPG treating unit expansion for Abu Dhabi National Oil Company in Abu Dhabi, United Arab Emirates (1995-1996)
  • H2SO4 alkylation unit operating manual for Chevron in El Segundo, CA (1995)
  • Hydrotreater, amine treating and sour water stripper unit revamp for Lagoven in Amuay, Venezuela (1995)
  • Hydrotreater unit design package for Unocal Science & Technology in Brea, CA (1994)
  • Evaluation of crude and delayed coking unit fractionation for the Unocal reformulated fuels program in Carson, CA (1993)
  • Hydrotreater relocation and revamp for Unocal in Carson, CA (1992-1994)
  • Hydrocracker revamp for Texaco in Bakersfield, CA (1992)
  • Natural gas liquids recovery unit revamp for Corpoven in San Joaquin, Venezuela (1990-1992)
  • Hydrocracker revamp for Unocal in Wilmington, CA (1988-1990)
  • Resid conversion complex design package for Intevep in Venezuela (1987-1988)
  • Circulating fluid bed combustor facility design for Unocal in Parachute Creek, CO (1986-1997)
  • Natural gas liquids recovery and liquid petroleum gas conversion to aromatics studies (1985-1986)
  • High density polyethylene unit design package for Union Carbide in Charleston, WV (1985)
  • Gas processing complex for Qatar General Petroleum Company in Doha, Qatar (1984)
  • Milne Point production facility for Conoco on the North Slope, AK (1984)
  • Gas processing facility for ARCO in Dubai, United Arab Emirates (1982-1984)
  • Waste heat recovery feasibility studies for Alyeska at Pump Station 9, AK (1982)
  • Fluid coking unit design package for EXXON in Florham Park, NJ (1981)
  • Heavy oil upgrading refinery for Independent Valley Energy Company in Bakersfield, CA (1980)
  • Gas centrifuge uranium enrichment project for the Department of Energy in Portsmouth,OH (1979)
  • Refinery expansion for Lagoven in Amuay, Venezuela (1978-1979)
  • Petrochemical complex for Saudi Petrochemical in Al Jubail, Saudi Arabia (1977)
MEMBERSHIPS:
  •  American Institute of Chemical Engineers since 1974

  •  

     
     
     
     
     
     
     
     
     

TO CONTACT US:
The Process Group, LLC
28562 Oso Parkway-Suite D-434
Rancho Santa Margarita, CA 92688
E-mail: info@theprocessgroup.com
Home Page|Services|Principals|Clients|Project|Contacts|Top of Page